
Modernization 179 km – Centro Parrilla downtown grid
Medellín, Colombia
Due to the increase in commercial activity in Medellin’s dowtown area, the pipeline netwrok located in this sector underwent a series of interventions with the use of trencless tecnology.
The execution of the works comprised three phases:
- Phase 1: Calibration of the hydraulic model.
- Phase 2: Conceptual design: hydraulic design of the aqueduct network.
- Phase 3: Detailed Design.