Bonyic hydroelectric project
Bocas del Toro, Panamá
Execution of complementary studies and research, designs, specifications and necessary documents for the acquisition, construction, assembly, commissioning and the blueprints required for the construction of the Bonyic hydroelectric project.
Supervision of works and coordination of contractual and technical relations between the corresponding contractors. The project is located in the northwest of the Republic of Panama, has a reservoir of 355,000 m3 of useful capacity and a total volume of 1,380,000 m3, a RCC dam of 38 m high and 173 m long at the level of the crest for a volume of 89,835 m3. Installed capacity 31.8 MW.