
Porvenir II hydroelectric project
Antioquia, Colombia
Final detail design and land management for the Porvenir II hydroelectric project construction. Installed capacity of 352 MW. Samana Norte River Utilization.
It has 3 generation units that will be at the foot of an arc-shaped, 140-meter-high compacted concrete dam on the waters of the Northern Samaná River in southeastern Antioquia.