Sogamoso Hydroelectric Project

Project Management
Affordable and clean energy
Foto pricipal del proyecto
Light blue circular gradient

It consists of exploiting the flow of the Sogamoso River through the construction of a dam. Based on the studies, an installed capacity of 820 MW was established, producing an average annual energy of 5056 GWh. The concrete faced gravel dam 190 m high, average flow of the Sogamoso river 474.6 m3/s, reservoir area 6,960 ha, total volume 4,800 Mm3. Construction period 5 years.